= 7 Things to Expect in a Solar Panel Installation Process | Key Solar 7 Things to Expect in a Solar Panel Installation Process | Key Solar jQuery(function($){ $('#et-info-phone').wrap(''); });

You have done your research and have decided to switch to solar power. That’s great! Enjoy long-term financial savings, plus conserve power through this clean energy source. The benefits of switching to solar power are endless. But are you ready for the installation process?

Tackling through the whole switch might be overwhelming, especially if it is your first time. There is just a lot to learn and research about. But no matter how many brochures you have leafed through, you are going to need help in preparing for the installation.

Do know that you can save more time and energy in calling for professional solar panel installation services than doing it yourself. That is why in this article, we have prepared a thorough list of things that you should expect during a solar panel installation.

First Things First: Solar Panel Installation Does Not Happen Overnight

A lot goes into the whole solar panel installation process. Going into this, it is important to expect that it does not happen overnight. Once you call a provider, they do not just go to your site and install the system right away. Instead, there are various things they need to do to properly prepare your site for the installation.

1. Site Visit and Assessment

One of the key steps in preparing your site for the installation is a site visit. During the site visit, your contractor will check and assess if your place is suitable for solar panel systems. Is there enough sun shining down on your roof? Is your roof even in condition to take the weight of the entire system? Are repairs necessary before moving on? How big is the site?

These things are important to ensure that your system is laying on a sturdy and safe platform. Skipping this step may lead to the untimely demise of your system and thousands of dollars down the drain. This may take 1-4 weeks depending on your provider.

2. System Design

Once they have assessed the site, the providers now have a better idea of what kind of system is best for your needs. They will consider your home’s unique attributes while creating the design as well. If necessary, they might even recommend the best components that go well with the design.

3. System Customisation

Speaking of components, as a client, you have a say on which components you want to integrate in the system. Whether you prefer a high-tier brand or a low-end one, or perhaps you want to explore hybrid inverters or stick to battery inverters, it’s your call.

Do note that during this time, your provider might also open the table for discussions on the payment options available. Are you leasing or leasing to own? Are you buying outright? It is safe to expect discussions on finances at this point.

4. Permit Applications

Once your system design and components have been finalised, it is now time to submit it for local government permitting. The process of approval may vary from one state to the other. The only common denominator is that permitting is mandatory for all solar panel installations.

Don’t worry, during this stage, good contractors will be right with you for the heavy lifting. All you need to do is wait for roughly 2-8 weeks. Again, approval speed is highly dependent on your region’s process.

5. Actual Solar Panel Installation

The best thing to hope for after the previous step is the local government’s approval, and once that happens, the actual solar panel installation can commence. This may take a day or a week, depending on how efficient your provider is at acquiring the supplies, ordering your panels, repairing roof damages, and so on.

They will come rushing to your place to make sure all the wirings are done right, all the panels are screwed tight, and all the components are where they should be. The more challenging parts are over, so if you are working with a reputable solar panel installation provider, then you should experience no hiccups at all.

6. Local Government Inspection

Once the provider is done with the installation, it is now time for the local government to step in again. They will visit the site to ensure that everything is up to code. If problems do arise, then your installation project might be kicked back a few days or weeks depending on how grave the error was. But once that is fixed, then brace yourself for the next step.

7. System Activation

With the local government’s go signal, you can go ahead and flip the switch to activate your solar panel system. Enjoy the benefits of harvesting solar energy for your home or business!